Dhupguri, West Bengal – In a major push towards green and sustainable energy, a new solar panel installation has been successfully completed at Vivekananda Para, Ward No. 6, Dhupguri (Lat: 26.58626°, Long: 89.016024°) on 4th November 2026.The installation work was carried out on the rooftop, aiming to harness solar energy for daily power needs. This eco-friendly project will help in reducing dependency on conventional electricity, cutting down power costs, and contributing to environmental conservation.This initiative aligns with the vision of promoting renewable energy adoption at the grassroots level. The use of solar power is not only cost-effective in the long run but also a crucial step in fighting climate change.Location: Dhupguri, Jalpaiguri District, West Bengal - 735210